Concrete Infrastructure

Plucks Engineering excels in effluent concrete infrastructure, providing secure containment, efficient solids capture, and customisable solutions with screening bunkers, stone traps, and ENVIRO SAUCER™ design.

Plucks Engineering can design and project manage and install both concrete and steel infrastructure. We can also design and oversee the installation of underground services.

Plucks Engineering has a long-standing history of designing and installing stone traps that are both tractor friendly and effective in minimising sludge and solids passing through to your pond, resulting in cleaner stored effluent with next to no sludge and crust buildup.

 

 

Plucks Engineered dairy effluent fibre bunkers are built to contain the heavy solids that our ADR 500 screens filter out. They are designed to contain the solids and leachate produced by the screening plant. They have levels and a drain guiding leachate and rainwater back to the stone trap. They are spill-proof for clean and efficient operation.

Common Questions About Concrete Infrastructure

What does concrete infrastructure mean in a dairy effluent system?

Concrete infrastructure refers to the structural elements that collect, contain, and direct effluent flow - including yard pads, collection channels, sumps, transfer pits, stone traps, and screening bunkers. These components form the foundation of the system: they protect downstream equipment, reduce solids load on pumps and storage, and ensure effluent moves predictably from source to storage. The right concrete scope depends on yard layout, effluent volume, and the location of storage relative to the collection point.

Can Plucks Engineering manage the concrete and civil works as part of a full effluent upgrade?
Why should I install a stone trap (sand trap or wedge) in my effluent system?
What is a screening bunker (fibre bunker) and how does it work?
What is the ENVIRO SAUCER™ and when is it the right storage choice?
How does the ENVIRO SAUCER™ cone shape improve mixing performance?
What factors affect effluent storage and mixing performance, and how is storage correctly sized?
Can effluent concrete infrastructure be designed to suit my specific farm layout?

There's nothing worse than machinery letting you down at the critical moment. Don't settle for imitations.

Call today on 0800 758 257 or click the button to send an enquiry.